We discussed what students need to turn in for their project on monday:
Rubric
Packet (with constraints and measurements)
Rough Drafts (4)
Final Draft
Students then used the rest of the class time to work on their project. While they were doing this, I walked around and graded the parts of the project that students had done. Any grade that was not a "4" on the rubric, can be altered and turned in before Tuesday to raise the score.
No comments:
Post a Comment